The HJT-36 Cockpit

7 thoughts on “The HJT-36 Cockpit”

  1. HAL Kanpur must be assigned the responsibility to manufacture the HJT32 trainer aircraft. The number of aircrafts manufactured per annum by the various units of HAL is dismally low. The nation is waiting for last sixty years to see atleast one aircraft to fly with indigenously developed aero-engine.
    Similarly the aircraft SARAS also must be assigned to HAL Kanpur for manufacturing. The design team of SARAS must be transferred to HAL Kanpur.
    P.K.Chaudhuri.

Leave a Comment

Your email address will not be published. Required fields are marked *


Scroll to Top